Delivery rule

Table 1
Layer number Delivery time Quantity or area Explain
Single and double sided 1 days Single and double layer, 5/10/20 pieces Weld resistance: green; plate thickness: 1.0, 1.2, 1.6; line width and line spacing≥5MIL; aperture.≥0.3mm; 1OZ; no half-hole; no BGA
2 days Single bilayer,≤50 tablets
4 days Single bilayer,≤300 tablets
7-8 days Single bilayer,≤20 square meters
8-10 days Single bilayer,>20 square meters
Single and double sided 2 days Single and double layer, 5/10/20 pieces Weld resistance: green (plate thickness: 0.8, 2.0); welding resistance: blue (plate thickness: 1.6); line width and line spacing≥5MIL; aperture.≥0.3mm; 1OZ; no half-hole; no BGA
3 days Single bilayer,≤50 tablets
5 days Single bilayer,≤300 tablets
7-8 days Single bilayer,≤20 square meters
8-10 days Single bilayer,>20 square meters
four layers 2 days Four layers, 5/10/20 pieces Weld resistance: green plate thickness: 1.0, 1.6; line width and line spacing≥4mil 1OZ; no half-hole; BGA:≥0.3mm; aperture.≥0.2mm
3 days The four level,≤50 tablets
5 days The four level,≤300 tablets
7-8 days The four level,≤20 square meters
9-10 days The four level,>20 square meters
The six level 3 days Six layers, 5/10/20 pieces Weld Resistance: Green Plate Thickness: 1.6; Width and Spacing≥4mil 1OZ; no half-hole; BGA:≥0.3mm; aperture.≥0.2mm
4 days The six level,≤50 tablets
6 days The six level,≤300 tablets
8-9 days The six level,≤20 square meters
10-12 days The six level,>20 square meters
The eight level 5 days Eight layers, 5/10/20 pieces Weld Resistance: Green Plate Thickness: 1.6; Width and Spacing≥4mil 1OZ; no half-hole; BGA:≥0.3mm; aperture.≥0.2mm
6 days The eight level,≤50 tablets
7 days The eight level,≤300 tablets
8-9 days The eight level,≤20 square meters
10-12 days The eight level,>20 square meters
Form two
Layer number Delivery time Quantity or area Explain
Single and double sided 5-7 days Single bilayer,≤300 tablets Processes other than Table 1
7-10 days Single bilayer,>300 tablets
four layers 5-7 days The four level,≤300 tablets
7-10 days The four level,>300 tablets
The six level 6-8 days The six level,≤300 tablets
8-12 days The six level,>300 tablets
The eight level 6-8 days The eight level,≤300 tablets
8-12 days The eight level,>300 tablets